University of Guelph

University of Guelph - Phase 1 Completed

Praxy Cladding Corp, working with BDA Inc and WALTERFEDY has completed The University of Guelph – Phase 1, covering a total of 27.000 Sq.Ft in material between May and August 2024. The wall assembly is composed of a membrane, subgirt, insulation and metal siding.

Our contract includes the installation of the Airoutshield SA280 weatherbarrier by SRP,  insulation PowerWool Cavityboard by PowerWool Insulation,  T125 Tclips supplied by Engineered Assemblies, sub-framing  Z bars and metal siding panels AD300 and AD275 by Vicwest.

Praxy will continue to work on this project next summer, and will install another 20.000Sq.Ft of material. 

For information on how we can help you with your building façade, please contact us at info@praxy.ca.