THE DRAKE HOTEL

The Fibre Cement panels are installed in the courtyard of the new addition to The Drake Hotel.  The courtyard was completely scaffolded to allow for the exterior trades to complete their work.  To complicate the install, the project was completed during the winter months, which necessitated tarping and heating the building to allow for the structural bonding materials to cure properly.  This was a very challenging, yet rewarding project.

Materials & Suppliers
  • 8mm thick Tectiva (TE90) supplied by Engineered Assemblies (3,500 sq.ft.)

AWARDS

2022 AZ Award of Merit
2022 AHEAD Americas – Rooftop Suite